Published: 7 January 2022

Energy Revolution Goes Live at Alexandra Gate

Energy Revolution™ plant equipment at Alexandra Gate Business Park has been commissioned and is now generating electricity on site. The 20kW combined heat and power engine, high efficiency boiler systems and new heating pumps will provide the building with the majority of its electrical requirement and provide sufficient heat for all the buildings hot water requirements.

Installed by our GET IM team, this clever engine is reducing the sites carbon footprint as it uses 100% of the power it generates with little or no losses, unlike the previous traditionally sourced grid electricity.  The CHP will generate circa 160,000 kWhs of electricity and 177,000 kWth of heat per annum for the offices which also includes a cafeteria, board room and meeting rooms.

sustainable combined heat and power engine

If you would like to join or find out more about The Energy Revolution™ and how it can benefit you and the environment please call, Tel. 024 7630 8830 or email new-power@getsolutions.co.uk.